Culvert Installation in Celina, TX

Driveway and drainage culverts around Celina, set to the rules of whichever office owns the road. Send the details and our featured local contractor follows up with a written quote.

Culvert Installation for Celina TX Properties

A driveway that crosses a roadside ditch, swale or drainage path needs a pipe under it so water keeps moving. Skip the pipe, or use one that is too small or set too low, and water stacks up against the fill, soaks it, and eventually cuts around or through it. Collin County's heavy clay makes this worse because water sits on the surface longer after rain.

Around Celina the bigger question is usually not how to set a pipe but whose rules apply. A culvert at the edge of a county-maintained road in unincorporated Collin County is permitted, sized and inspected by the county. A crossing inside Celina city limits goes through the city. Celina also reaches into Denton County; the U.S. Census Bureau places about 6,069 of the city's residents on the Denton County side, where unincorporated roads fall under Denton County instead. This page lays out what the official rules say so you can ask the right office and the right questions.

Culvert Installation Services

New Driveway Culverts

Setting the pipe for a new driveway connection after the permit and sizing are in hand.

Culvert Replacement

Pulling a failed, crushed or undersized pipe and replacing it to current county or city standards.

Widening an Existing Drive

Adding pipe length when a driveway gets wider, which in Collin County means bringing the old culvert up to code too.

Private Drainage Crossings

Pipe crossings where a private drive crosses a swale or draw inside the property, away from the road.

County Road Tie-In

Matching the driveway surface to the road edge so the tie-in meets the county requirement.

Ditch Regrading

Reshaping the ditch at the crossing so water enters and leaves the pipe freely.

Collin County Driveway Culvert Rules

The Collin County Drainage Design Standards, approved by Commissioners Court on September 28, 2020, require a culvert and driveway permit for any new driveway connection or culvert installation along a road the county maintains. The application goes to Collin County Development Services along with the septic (on-site sewage facility) permit or development permit for the house or building. Every new driveway culvert must be designed by an engineer or sized by Collin County Public Works, and installation is the lot owner's responsibility.

  • Pipe: corrugated metal pipe or reinforced concrete pipe, no less than 15 inches in diameter.
  • Slope: a minimum flowline slope of 0.50 percent.
  • Cover: at least 12 inches from the top of the pipe to finished grade, unless an engineering analysis for less cover is approved by Public Works.
  • Length: at least the driveway width plus 4 feet on each side, and not more than 60 feet without approval from the Director of Engineering.
  • Ends: mitered at 6 to 1, with safety cross pipes at 2-foot spacing required on culverts over 30 inches along roads outside residential subdivisions.
  • Timing: driveway culverts must be in before building permits are issued or construction starts on the lot.
  • Design storm: driveway culverts are designed for the 5-year storm and checked against the 100-year storm.

The county's culvert installation information sheet adds practical rules. Collin County does not sell or install culverts. Within the county road right-of-way it allows only corrugated metal pipe, with other materials considered on appeal; plastic and steel pipe are not allowed. The pipe may not be set below the natural flow line of the ditch, so each end has to sit even with the ditch bottom, which sometimes means a slight rise in the driveway over the pipe. The owner or agent schedules an inspection before covering the pipe, and the cover has to be an all-weather material such as road base, crushed concrete, gravel or asphalt, never construction debris, brick or wood. Residential driving surfaces run 12 to 20 feet wide with 5-foot turnouts, and driveways must be at least 40 feet apart. Headwalls are optional. Culverts that do not meet the permit can be removed after a 14-day notice, and a culvert installed and inspected to the rules becomes county property that the county will address if drainage problems come up later.

Inside Celina City Limits

The City of Celina requires an Earthwork Permit under Section 3.12.006 of its ordinances for earth-disturbing work, including clearing, grubbing, grading, excavation and embankments, and adds a Floodplain Development Permit when the site is in a designated floodplain. Any person or contractor working in the public right-of-way needs a city Right-of-Way Permit, filed through the city's MyGov portal with project plans, a certificate of insurance, and a TxDOT authorization letter when a state highway is involved. For a driveway crossing on a city street, ask Celina Engineering which of these applies and what pipe and detail the city standard calls for.

Most culvert work happens as part of a larger driveway grading or skid steer job, so it pays to settle the culvert permit before the drive is cut.

Questions to Ask Before a Culvert Goes In

  • Who maintains the road: Collin County, Denton County, the City of Celina, or TxDOT?
  • Has the pipe been sized by an engineer or by Collin County Public Works, and what diameter and length did they specify?
  • Is the quoted pipe corrugated metal, and does it meet the 15-inch minimum and the length rule for your driveway width?
  • Will the pipe ends sit even with the ditch flow line, and will the driveway have a slight rise over the pipe?
  • Who schedules the inspection before cover goes on, and what cover material is in the price?
  • If you are widening a drive, does the quote include bringing the existing culvert up to current requirements?
Culvert installation on your Celina TX property

Tell us the road, the driveway width, and whether you already have a permit. Our featured local contractor reviews it and gives you their own written quote.

Call Now
Get a Free Acreage Estimate

No obligation. We'll be in touch soon.

Culvert Installation Celina TX: Frequently Asked Questions

When do I need a culvert on my Celina TX property?
Wherever a driveway, road or path crosses a ditch, swale or low spot where water moves during rain. Fill without a pipe blocks the flow, and the water backs up, soaks the fill, and eventually cuts around or through it. In Collin County, a culvert is also a permit item any time a new driveway connects to a county-maintained road.
What size culvert do I need for a driveway in Collin County?
Collin County's drainage standards set a minimum of 15 inches in diameter and require every new driveway culvert to be designed by an engineer or sized by Collin County Public Works. The pipe must be at least the driveway width plus 4 feet on each side, with at least 12 inches of cover. The right diameter for a given crossing depends on the drainage area above it, which is why the county sizes it rather than leaving it to a guess.
Is a permit required to install a culvert in Collin County?
Yes, for a new driveway connection or culvert along a road the county maintains. The culvert and driveway permit goes to Collin County Development Services with the septic or development permit for the lot, and the culvert must be installed before building permits are issued. Inside Celina city limits, the city's earthwork and right-of-way permits apply instead.
What pipe material does Collin County allow?
The drainage standards list corrugated metal pipe or reinforced concrete pipe, but the county's installation sheet allows only corrugated metal pipe inside the county road right-of-way, with other materials considered on appeal. Plastic and steel pipe are not allowed there.
Does Collin County install the culvert for me?
No. Collin County does not sell or install culverts. The lot owner is responsible for installation, and the owner or their agent schedules a county inspection before the pipe is covered. Once a culvert passes and sits in the right-of-way, it becomes county property.
What happens if a culvert does not meet the county rules?
The county can issue a written notice giving 14 days to correct it, then remove the culvert without reimbursement, and may charge the owner for removal. A culvert that skipped inspections can also be removed if it causes drainage problems later.